-Applying fuel spray atomization, the burn efficiency is high and the exhaust fulfills European environmental protection standards.
-High-voltage arc ignition, ignition current is only 1.5 A, and ignition time is less than 10 seconds
-Due to the fact that key elements are imported in the original package, reliabilty is high and service life is long.
-Welded by the most advanced welding robot, each heat exchanger has a good appearance and high coherence.
- Applying concise, safe and fully automatic program control; and highly precise water temperature sensor and over-temp protection are used to double safety protection.
-Suitable for preheating engine at cold start, heating the passenger compartment and defrosting the windshield in various types of passenger buses, trucks, construction vehicles and military vehicles.
Type |
YJP-Q16.3 |
Motor operates in low temperature and warming ,defrosting of bus
|
Thermal flow(kw) |
16.3 |
Oil wear (kg/h) |
1.87 |
Voltage(v) |
DC12/24V |
Power(w) |
170 |
Circulation method |
Coolant pump |
Weight(kg) |
22 |
Main Application |
Engine cold start and heating |
principle:
Under the operation of motor, oil is taken to jet by pump to produce oil fog under high speed air blow with motor circling. oil fog is burning under high voltage discharge of igniting electrode, its heat is sent to circling liquid in heat exchanger by conductive slice, under the operating of pump, liquid is taken to radiant equipment to make vehicle warm and defrost.
Installation Instructions
Installation
Selecting product type,installation is seemed to be more important, because it decides usage effect of warming system directly. Installation has five steps:
1.To install heater conveniently, please refer to the dirgram(below), heater should be installed in a cabin alone with not too high temperature and no combustible. Inlet and exhaust air openings must be clean not to inhale snowflake and spattering spray, air-exhausted opening can't face to the direction of driving.
2.inlet-air of heater is ample, so a shutter (total area≥100cm2) should be cut in the side of cabin, and waste air is prohibitted to be inhaled to inlet-air pipe to affect the operation,air-exhausted pipes stretch to the outside of cabin.
3.Oil pipe (φ8×1) is made from nelon colophony, joints M14×1.5, pipes must be joint tightly. Difference of oil tank liquid surface and heater center is within ±500mm, distance between in-oil joint and surface of oil pipe is within 3m, heater pipes are single ,they can't be used with others pipe together.
4.Electric connection refers to circuit diagram.
5.Canalage of heater has reasonable arrangment,affusion is at the top , position of heater is as low as possible, pipe can't be converted into hard bend, pipes resistant-pressure>6kg/cm2
Our factory's production units are equipped with high tech machineries, strict quality,control testing devices and a team of professional technicians and engineers endorsing the quality and authenticity of our products.
In 2006, our company has passed ISO/TS16949:2002 quality management system certification. We also bagged the CE certificate and Emark certificate making us among the only few companies in the world acquiring such high level certifications.
Currently being the largest stakeholders in China, we hold a domestic market share of 40% and then we export them around the globe particularly in Asia, Europe and Americas.
Meeting the standards and demands of our customers have always been our top priority. It always encourages our experts to continuously brain storm, innovate, design and manufacture new products, impeccably suitable for the Chinese market and our customers from every nook of the world.
Q1. hat is your terms of packing?
A: Generally, we pack our goods in neutral white boxes and brown cartons. If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
Q2. What is your terms of payment?
A: T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.
Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF, DDU.
Q4. How about your delivery time?
A: Generally, it will take 30 to 60 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.
Q5. Can you produce according to the samples?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.
Q6. What is your sample policy?
A: We can supply the sample if we have ready parts in stock, but the customers have to pay the sample cost and the courier cost.
Q7. Do you test all your goods before delivery?
A: Yes, we have 100% test before delivery
Q8: How do you make our business long-term and good relationship?
A:1. We keep good quality and competitive price to ensure our customers benefit ;
2. We respect every customer as our friend and we sincerely do business and make friends with them, no matter where they come from.